Manpower: Pars Panel Company has been succeeded to educated and train experience and staff in foreign known systems. Technical personnel of this company are able to apply pre fabricated parts and special tools in quality and beauty of buildings. |
|
Personal |
Quality |
Nationality |
|
Directories & Managers |
8 |
Iranian |
|
Administration |
35 |
Iranian |
|
Engineering & Technicians |
64 |
Iranian |
|
Skilled Manpower |
62 |
Iranian |
|
Semi Skilled Manpower |
87 |
Iranian |
|
Labor |
Depends On Project between 100-200 |
|
Equipment Pars Panel Company, by studying, investigating and visiting advanced countries in this system and by cooperating with domestic and foreign factories of machinery & tools, make use of the best and most modern types of them for the purpose of having more speed and efficieny. |
|
Air Compressor |
9 |
Caravan & Container |
8 |
|
Welding Machine |
18 |
Work ship Equipment |
32 |
|
Lifting Equipment |
4 |
Tools |
145 |
|
Earth Moving Equipment |
6 |
Carpetner Equipment |
16 |
|
Diesel & Gasoline Generators Sets |
4 |
Press, Steel Cuter |
6 |
|
Concrete Equipment |
7 |
Car, Pickup, Minibus |
28 |
|
Type of activity Pars Panel Company by having possibility of construction & installation of two types of pre fabricated system has placed difference facilities in the hand of operators. A. Pre fabricated system by installing parts in place in favorable dimension and sizes with ability of replacement and resintallation. B. Conex system and kiosk (cabin) and caravan system ability of carriage and connection to several conex and sanitary services and guard kiosk.
Advantage
- Favorable dimension in view of length and height.
- Making use of tile & ceramic and complete insulation in sanitary service and kitchen.
- Ability to replace and resintallations.
- Capability in increase or decrease and or change in interior walls.
- Ability to change and repairing.
- Resistna against earthquake.
|
|
|
 |
 |
 |
|
Ready made structure for installation on site |
Workshop conex and kiosk with the production capacity of 2 sets daily |
Using lift track to speed up the work |
 |
 |
 |
|
Mobilization with Pars Panel conexes |
Conex for equipping the site |
Executing the foundation making use of concrete |
|